ABOUT THE FACTORY

We produce modern demanded products that meet international standards

In June 2019, during the visit of President Mirziyoyev Sh.M. to Tashkent region of Yangiyul district and in accordance with Resolution No.9 of 16.06.19, the Presidential Administration approved a roadmap for the establishment of an industrial zone. In 2020, the Enter Steel engineering plant was built on its territory in order to meet the growing demand for metal structures. The production capacity of the plant allows it to produce 15 thousand tons and galvanize up to 40 thousand tons of metal constructions a year. Machine-building plant of FDI "Enter Steel" LLC is one of the largest enterprises in Uzbekistan, specialising in the manufacture of metal structures, cranes, vessels and pressure apparatuses. The enterprise is equipped with modern equipment from the best manufacturers from Europe and USA. The production capacity of the plant allows to manufacture 15 thousand tonnes and galvanise up to 40 thousand tonnes of steel structures per year. The ambitious team of Enter Steel from the first day of the plant's existence has been making efforts to achieve the set goal - to increase the output volume up to 30 thousand tonnes per year. We value each of our customers and guarantee the highest quality of products and fulfilment of all contractual obligations

OUR ADVANTAGES

We value each of our customers and guarantee the highest quality of our products and fulfillment of all contractual obligations.

01

Highly qualified engineers: 40+

02

High category designers: 50+

03

Own design office in Tashkent, Turkey and Ukraine

04

The only plant in Uzbekistan and the second one in Central Asia that has the international ASME certificate.

05

ASME, ISO, IQNet certificates.

06

A modern laboratory equipped with the latest IberTest (Spain) equipment.

See how it works in 2 minutes

Customers and Partners

HISTORY OF THE PLANT

The factory was established to meet the increasing demand for metal structures in the Republic of Uzbekistan.

In order to fulfil the tasks set by the President of the Republic of Uzbekistan Shavkat Mirziyoyev, Enter Steel machine-building factory specialising in the production of metal structures was built in Yangiyul district of Tashkent region in 2020. In response to the growing demand in the country for these products, and in accordance with the Decree of the Cabinet of Ministers of Uzbekistan №657 dated 27.10.2020 "On measures to organise a small industrial zone in Yangiyul district of Tashkent region", the plant expanded and became one of the major industrial enterprises in the region